Sand and Cement Calculator
Work out the sand and cement needed for a volume of 4:1 mortar.
Sand required
0.8tonnes
- Cement
- 7 × 25 kg bags
- Mix volume
- 0.5 m³
Based on a 4:1 sand to cement mix, about 320 kg of cement per cubic metre.
Work out the sand and cement needed for a volume of 4:1 mortar.
Sand required
0.8tonnes
Based on a 4:1 sand to cement mix, about 320 kg of cement per cubic metre.